sprint

PredatorAlgo Landing

Período: 2026-06-22 → 2026-07-03 · Generado por: oscar · 2026-07-06 08:27 · Fuentes: jira, github

🇪🇸 Sprint — PredatorAlgo Landing · 22 jun – 3 jul 2026

Resumen (3 líneas máx): Solo los primeros 3 días del período tuvieron entregas: 5 PRs mergeados a main (23–24 jun, todos de Alvaro Hinojosa) que cerraron el checkout Lifetime, el re-key de Telegram a customerId y un fix legal/footer. Del 25 de junio al 3 de julio (9 días) no hubo un solo commit ni PR mergeado a main, ni PRs abiertos — silencio total en GitHub. La consulta en vivo a Jira falló en esta sesión (error de autenticación 401 contra la API de Atlassian), así que el estado de tickets Done/In Progress para el período no pudo verificarse en vivo; se cruzó contra el último extracto confiable de Jira (29 jun 2026, epic SD-1170) solo como referencia histórica.

⚠️ Nota de fuente de datos — Jira: a diferencia de otros proyectos del portfolio, PredatorAlgo sí tiene backlog real en Jira (epic SD-1170, 111 tickets registrados en el extracto del 29 jun). El problema no es que no haya backlog: es que esta sesión no pudo autenticarse contra Jira (probado con Basic Auth, Bearer y el endpoint nuevo /search/jql contra profunded.atlassian.net — las tres vías devolvieron 401/0 resultados pese a que se sabe que hay tickets reales en SD). Por eso el "comprometido/completado" en puntos y el estado ticket-por-ticket del tramo 25 jun–3 jul no se reportan como cifra en vivo — se marcan N/D y se contrastan contra el último snapshot verificado (informe team-review del 29 jun 2026, que sí tuvo acceso a Jira). Recomendación operativa: renovar/revisar el token de Jira usado por sbg-pm antes del próximo reporte.

ComprometidoN/D — Jira no disponible en vivo esta sesión (board_id=0 en el registry; tampoco hay sprint Jira formal, solo el epic SD-1170)
Completado5 PRs mergeados · 9 commits (todos 23–24 jun) — puntos: N/D (sin acceso a Jira)
VelocityN/D — sin acceso a historial de sprints Jira. Referencia GitHub: 5 PRs/9 commits concentrados en 2 de 12 días del período
Carry-over0 PRs abiertos al cierre (confirmado con gh pr list --state open → 0 resultados). Posible carry-over no confirmable: SD-1171 (Crear indicadores en TradingView) figuraba "In Review" en el extracto del 29 jun, sin PR asociado localizable en el repo — no se pudo verificar su estado actual
Alcance agregadoN/D — Jira no disponible en vivo

🇬🇧 Sprint — PredatorAlgo Landing · Jun 22 – Jul 3, 2026

Summary (max 3 lines): Only the first 3 days of the period shipped anything: 5 PRs merged to main (Jun 23–24, all by Alvaro Hinojosa) closing out the Lifetime checkout fix, the Telegram customerId re-key, and a legal/footer fix. From June 25 to July 3 (9 days) there was zero merged commits/PRs to main and zero open PRs — total GitHub silence. The live Jira query failed in this session (401 auth error against the Atlassian API), so ticket-level Done/In Progress status for the period could not be verified live; it was cross-checked against the last reliable Jira extract (Jun 29, 2026, epic SD-1170) purely as historical reference.

⚠️ Jira data-source note: unlike other projects in the portfolio, PredatorAlgo does have a real Jira backlog (epic SD-1170, 111 tickets per the Jun 29 extract). The problem isn't a missing backlog — it's that this session couldn't authenticate against Jira (tried Basic Auth, Bearer, and the newer /search/jql endpoint against profunded.atlassian.net — all three returned 401/0 results despite known real tickets existing in SD). So committed/completed points and per-ticket status for Jun 25–Jul 3 are not reported as live figures — they're marked N/D and contrasted against the last verified snapshot (the Jun 29, 2026 team-review, which did have Jira access). Operational recommendation: renew/review the Jira token used by sbg-pm before the next report.

CommittedN/A — Jira unavailable live this session (board_id=0 in the registry; also no formal Jira sprint, only epic SD-1170)
Completed5 merged PRs · 9 commits (all Jun 23–24) — points: N/A (no Jira access)
VelocityN/A — no access to Jira sprint history. GitHub reference: 5 PRs/9 commits concentrated in 2 of the period's 12 days
Carry-over0 open PRs at close (confirmed via gh pr list --state open → 0 results). Unconfirmable possible carry-over: SD-1171 (Create TradingView indicators) was "In Review" as of the Jun 29 extract, with no locatable PR in the repo — its current status could not be verified
Scope addedN/A — Jira unavailable live

Sources: Jira epic SD-1170live query failed this session (401 Basic Auth / 403 Bearer / 0 results on /search/jql against profunded.atlassian.net, verified with curl); cross-referenced against the last verified live extract, reports/predatoralgo/areas/devs/oscar/oscar-team-review-2026-06-29-predatoralgo.md (extracted live 2026-06-29). GitHub swissbull-group/predatoralgo — PRs #88#92, git log origin/main for 2026-06-22..2026-07-04, gh pr list --state open (0 results), gh run list --branch main. Period 2026-06-22 → 2026-07-03. Sprint boundaries approximated by date range — board_id: 0 in projects/predatoralgo.yaml means there's no real Jira sprint object to anchor to. No invented data.

✅ Actualización — Jira en vivo (misma sesión, vía MCP de Atlassian, 2026-07-06)

El fallo de arriba fue específico del sub-agente. La sesión principal sí tiene Jira funcional. Confirmado en vivo: los 5 tickets de los PRs mergeados (SD-1384, SD-1385, SD-1386, SD-1390, SD-1394) están Done. SD-1393 (subtask referenciado en el commit de SD-1390, sin PR propio) sigue In Review — pendiente aunque el commit ya se mergeó. SD-1171 (indicadores TradingView) sigue In Review, asignado a Franco Guerra (no a Alvaro/Leo/Oscar) y sin actualizar desde el 28 de mayo — más de 5 semanas estancado, y explica por qué no aparece en la actividad del trío de devs. SD-1238 (revisión legal externa) sigue To Do, asignado a Rafael. Se confirmó además vía JQL sobre el epic SD-1170 que ningún ticket hijo se actualizó entre el 25 jun y el 3 jul — Jira coincide de forma independiente con el silencio observado en GitHub: el parón de 9 días es real, no un artefacto de falta de datos.

✅ Update — Live Jira (same session, via Atlassian MCP, 2026-07-06)

The failure above was specific to the sub-agent. The main session does have working Jira access. Live-confirmed: all 5 tickets behind the merged PRs (SD-1384, SD-1385, SD-1386, SD-1390, SD-1394) are Done. SD-1393 (subtask referenced in SD-1390's commit, no PR of its own) is still In Review — pending despite the commit having merged. SD-1171 (TradingView indicators) is still In Review, assigned to Franco Guerra (not Alvaro/Leo/Oscar) and unupdated since May 28 — over 5 weeks stale, which explains why it didn't show up in the core dev trio's activity. SD-1238 (external legal review) is still To Do, assigned to Rafael. Also confirmed via JQL against epic SD-1170 that zero child tickets were updated between Jun 25 and Jul 3 — Jira independently corroborates the GitHub silence: the 9-day stop is real, not a data-availability artifact.